
Successfully manufacturing and fully integrated SCADA system of seven PLC panels inside IGEC Arabia Facility including but not limit the following : -
- Supplying, installing panel components as per approved drawings (Panels, thermostat, Fans, door switches, power supply, slim relays, MCBs, TBs, panel accessories)
- Configuration of PLC hardware and software in accordance with approved design documents
- Configuration of inputs / outputs modules hardware and software in accordance with approved design documents
- Complete Factory acceptance test including: -
• Panels inspection test.
• PLC acceptance and configuration test.
• I/O modules test.
• Scheme function test.