ICEG ARABIA Preloader
TRANSMISSION I DISTRIBUTION I SUBSTATION I RENEWABLES

EMS Upgrade Project -RTU- South Regional Control Centre

Aug 22, 2025 1 mins read

بيسبيسب
End User: SEC [SRCC] 
Contractor: GE 
Status: Completed
- Supplying and integrated 2 RTU panel.
- Installation of RTU panel.
- Interfacing with existing system.
- Checking between RTU and SCADA system.