ICEG ARABIA Preloader
TRANSMISSION I DISTRIBUTION I SUBSTATION I RENEWABLES

. Berri flow line

Aug 22, 2025 1 mins read

End User: ARAMCO 
Contractor: RTCC 
Status: Completed
- 13.8KV line auto reclose relay test.
- 13.8KV OHPL line parameter test.
- 13.8KV cable sheath test.
- 13.8Kv cable high-pot test.

shutterstock_2542247389