End User: ARAMCO/TR
Contractor: WESCOSA
Status: Ongoing
- Point to point (scheme check).
- C.B testing.
- Bus bar testing.
- Relay acceptance test (REF 615 & REF 620 for ATS).
- Protection Relay final setting applying.
- Power meter testing.
- CT & VT testing.
- Functional test.
- Auxiliary relay testing.
- RMU testing (bus bar IR – CR – HI POT – relay testing and final setting
(P3U30) – CT testing – C.B testing).
- Dry Type Transformer (TTR – Winding Resistance – IR & PI).
- MDP LV SWG (bus bar testing – Relay acceptance & final setting – MCCB –
CT & VT – Functional test).