NEW AINDAR 115/33KV SUB#30 Testing & Commissioning:

Aug 22, 2025 2 mins read

End User: SEC             Contractor: ACC              Status: Ongoing
- 115KV GIS Testing & commissioning.
- 115KV protection relays testing & commissioning.
- 33KV GIS switchgear testing& commissioning.
- 33KV protection relays testing & commissioning.
- Testing and commissioning work for 13 Remote End.
- 115/33 power transformer testing & commissioning.
- 115KV capacitor bank testing & commissioning.
- GIS & MV SWGR High voltage test 