ICEG ARABIA Preloader
TRANSMISSION I DISTRIBUTION I SUBSTATION I RENEWABLES

Replacement of AVR and LCC 110/13.8 KV Haram-2 s/s, Madinah

Aug 22, 2025 1 mins read

End User: SEC 
Contractor: Saudi Emar 
Status: Completed
- Retrofit exist AVR relay by ZIV AVR relay.
- Isolation and replacement.
- Wiring modification.
- scheme check testing.
- Acceptance and final setting test.
shutterstock_2466848599