ICEG ARABIA Preloader
TRANSMISSION I DISTRIBUTION I SUBSTATION I RENEWABLES

Safania Debottlenecking

Aug 22, 2025 1 mins read

End User: ARAMCO 
Contractor: EATON 
Status: Completed
- 13.8 & 4.16 KV MV SWG .
- Protection relay acceptance test and final setting applying (micom easergy
P141/P142/P143/P243/P643) & GE multilin 850D.
- Transformer stability test.
- Bus bar Stability test.
- Functional test.
- Testing all signal and measurement with PSA. 