The SARAI project was a collaboration between El Kharafi International and ECG_Hill International.
IGEC was contracted to perform 22kV cable testing and negotiation for the project. The scope of work included conducting continuity tests, insulation resistance tests, and very low-frequency tests to ensure the proper functioning of the cables. These tests are crucial to identifying any defects or abnormalities in the cable’s insulation and conductors, and ensuring that they meet the necessary safety and operational standards. The project was completed successfully, and the cable testing and negotiation performed by IGEC contributed to the overall success of the SARAI project.
Project Facts and Figures
End User | EETC |
Main contractor | El Kharafi International/ECG _Hill International |
22kV Cable Testing and Negotiation,