End User: TAWZEA
Contractor: ACCIONA AGUA
Status: Completed
- Testing, commissioning and Energization of 3 Transformer 13.8 / 0.4 kV 2500
kVA Primary: Delta Secondary: Star.
- Testing, commissioning and Energization of 2 Transformer 13.8/ 0.69 kV
5000 kVA Primary: Delta Secondary: Star.
- Testing, commissioning and Energization of 2 Transformer 13.8/ 0.4_0.69 kV
4200 kVA Primary: Delta Secondary/TT: Star.