Project Facts and Figures
End User | EETC |
Main contractor | ZTPC |
Testing and Commissioning 220kV/66kV/22kV substation electrical equipment including but not limited to,
- 220kV GIS LCC, Interface and interlocking.
- 66kV AIS LCC, Interface and interlocking.
- 220kV Control and protection panels testing and commissioning.
- 66kV Control and protection panels testing and commissioning.
- 11kV switchgear Testing and Commissioning
- 175 MVA, 40 MVA Transformers testing including TRMK and MDU.