Project Facts and Figures
End User | EETC |
Main contractor | SIEYAN |
Testing and Commissioning 220kV/66kV/22kV substation electrical equipment including but not limited to,
- 220kV GIS LCC, Interface and interlocking.
- 66kV AIS LCC, Interface and interlocking.
- 220kV Control and protection panels testing and commissioning.
- 66kV Control and protection panels testing and commissioning.
- 11kV switchgear Testing and Commissioning.
- All outdoor component including Surge arrestor ,Line Trap, CCVT ,Neutral DS and NER.
- 175 MVA, 40 MVA Transformers testing including TRMK and MDU.