Project Facts and Figures
End User | MA’ADEN / FluorCorp |
Main contractor | Dragados Gulf |
Pre- Commissioning and commissioning the electrical system including but not limited to,
- 13.8/4.16 kV AIS Switchgears.
- 0.48 kV Motor Control Centers.
- UP To 50 MVA Power Transformers.
- LV/MV Motors.
- PLC Programming and SCADA.
- Emerson and BORRI UPS’s Commissioning.
- ROCKWELL VSD Commissioning.