Project Facts and Figures
End User | |
Main contractor |
Pre- Commissioning and commissioning the electrical system including but not limited to,
- 6.3 kV AIS Switchgears.
- 0.38 kV Moror Control Centers.
- UP To 30 MVA Power Transformers.
- LV/MV Motors.
- LV/MV cable.
- Communication protocol (Modbus/ Profibus) programming.
- VSD Commissioning.
- UPS’s/Batteries Commissioning.
- Generator Protection Panels.
- Transformer Protection Panels.
- Field Excitation Panels